Now in closed beta.Book a demo to get started.
Use cases

Introduce the interface a planned swap needs

Architecture and boundaries|The work pauses once the plan is written. Somebody reads the approach and approves it before any code exists, and the run continues from there.

The seam a planned replacement needs, added ahead of the replacement with today's implementation behind it.

The ticket

Introduce the interface a planned swap needs, with the current implementation behind it.

Acceptance criteria

  • Callers depend on the interface rather than the implementation
  • A contract test suite pins the behaviour the interface promises
  • The current implementation passes that suite unchanged
  • No behaviour changes in this ticket

What lands as proof

A contract suite the current implementation passes, which is what makes the eventual swap a small change.

Why teams defer it

  • It delivers no visible change, so it is hard to prioritise before the swap is urgent.
  • Designing the interface from one implementation risks encoding that implementation's quirks, which needs care.

Questions

What does the agent actually change?
The ticket is scoped to one outcome: introduce the interface a planned swap needs, with the current implementation behind it. Work that serves that outcome is in scope, and anything outside it is left for a separate ticket, so the pull request stays reviewable.
How do I know the work is done?
The pull request carries the evidence, not only the diff. Here that means callers depend on the interface, tests pin the contract, so a reviewer can confirm the result without reproducing the work locally.
How much oversight does this need?
The run stops once the plan is written. Somebody reads the approach and approves it before any code exists, which is the cheapest moment to redirect the work.

Ready to put the fleet to work?

Contact us for a demo with an expert.